Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria becomes part of Southern Gas Corridor infrastructure

Photo: library

Earlier this week, Energy Minister Temenuzhka Petkova joined a symbolic event – the ceremony of placing the first pipe in the Trans-Anatolian Natural Gas Pipeline (TANAP) in Selim, Turkey. The significance of the event shows in senior attendance including the presidents of Azerbaijan, Turkey and Georgia, European Commission Vice President Maros Sefcovic and of course TANAP Managing Board President Rovnag Abdullaev.

During the ceremony Minister Petkova said that Bulgaria’s gas connections with Greece and Turkey were an integral part of the Southern Gas Corridor infrastructure. They are going to provide for security and diversification of natural gas supplies and sources for both Bulgaria and the region of South-East Europe. For the Bulgarian government completion of inter-connectors with neighboring countries is a priority in the energy sector. As an example of that Petkova pointed to continuing busy talks of the joint Bulgaria-Turkey working group for drafting a pre-investment study of the Turkey-Bulgaria gas connector.

During her visit to Selim Minister Petkova met with EC Vice President Maros Sefcovic who confirmed the Commission’s support for construction of the Bulgaria-Greece inter-connector as an important part of the Southern Corridor. Petkova gave assurances to Sefcovic that the Bulgarian side had worked out a detailed roadmap with activities and deadlines. Under it the gas pipeline should be completed by 2018. For the current year the cabinet has envisaged a government guarantee worth 80 million euro, a further expression of this country’s efforts for a speedier construction of the inter-connector. By the way, at the European Union Council held in Brussels two days later, PM Borissov urged Europe to support financially this project.

In conclusion let us recall that the Trans-Anatolian Natural Gas Pipeline with a length of 1850 km is planned to go across Turkey’s territory from the Georgian-Turkish and Turkish-Greek borders and construction should complete in 2018. It should then become operational with an initial capacity of 16 billion cubic meters. Of that quantity 10 billion cubic meters will reach Italy via the Trans-Adriatic pipeline. The quantity includes 1 billion cubic meters annually that should be supplied to Bulgaria.

English Daniela Konstantinova




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Assen Vassilev

PP-DB will negotiate government with GERB only if it signs health cordon around Peevski

"We Continue the Change - Democratic Bulgaria (PP-DB), the second largest parliamentary group, has said that it will support the formation of a regular government only if GERB-SDS agrees to sign the PP-DB declaration calling for a "cordon sanitaire"..

published on 12/8/24 5:54 PM
Denitsa Sacheva

Boyko Borissov is our candidate for prime minister, GERB's Sacheva says

The GERB party has already made every possible compromise . Now it is the turn of other political forces to show statesmanship, because they are also responsible for what will happen in Bulgaria, Denitsa Sacheva, deputy leader of the GERB-SDS..

published on 12/8/24 3:17 PM
Dragomir Stoynev

Dragomir Stoynev, BSP: The political crisis has not yet been resolved

Dragomir Stoynev, an MP from the BSP-United Left coalition, told BNR that the election of the parliamentary speaker was an agreement between political forces to stabilise the political situation. On 6 December, St Nicholas' Day, the 51st National..

published on 12/8/24 12:26 PM