Bulgaria and Greece signed an agreement for construction of the gas interconnector between the two countries. The project will be fulfilled by a joint venture. Bulgaria and Greece will have equal participation in the company. Initially the interconnector will have the capacity to transfer 3 billion cubic meters of gas per year. Later, it will reach its maximum capacity of 5.5 billion cubic meters. The interconnector is expected to start functioning until 2020.
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
As of 1 December until the end of February, driving an old car in the centre of Sofia will be subject to a EUR 25-100 fine. The fines for legal entities will be 10 times higher – from EUR 500 to EUR 1,000. The low emission zone was put in place..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
+359 2 9336 661