Over the next seven years, more than BGN 1.5 billion (EUR 765 million) will be invested in measures under the transport connectivity program, as the measures are important for improving the climate and for the implementation of green policies, Minister of Transport Georgi Gvozdeikov said at the CEE Green Transition Forum in Sofia.
According to the minister, over 306 million euros will be used to improve the railway infrastructure, out of a total of over EUR 510 million of funds from the National Recovery and Resilience Plan. By 2026, this country needs to complete the modernization of railway transport, the minister said. He added that serious investments in the construction of charging stations for electric vehicles should be considered.
GERB/SDS has withdrawn its nomination for president of the National Assembly. In the upcoming 8 th attempt to elect a president of parliament, there will be 3 candidates. Vazrazhdane is once again nominating Petar Petrov. There Is Such a People (ITN)..
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
+359 2 9336 661