Bulgaria’s cabinet adopted a resolution that the new 400 KV electric transmission network between Maritsa East substation in Bulgaria and Nea Santa substation in Greece will become an object of national significance. The European Commission defined that project as a project of common European interest. It includes the construction of 4 power grids needed for the fulfillment of the high-priority electric corridor North-South. The construction of a new inter-system power grid with a total length of 122 kilometers on Bulgarian territory and 29 kilometers on Greek territory is a key element of that project. The power grid will have a capacity of 1,500 Megawatts and will connect Maritsa East and Santa Nea substations.
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661