Prime Minister Boyko Borissov and Minister of Environment and Water Ivelina Vassileva unveiled earlier today a new regional waste management system builtin the village of Sheremetia near Veliko Tarnovo. The system has been financed with more than 16millioneurofrom the Environment Operational Program. The facility will receive and treat the waste of the municipality of Veliko Tarnovo and of five neighboring municipalities – Lyaskovets, Gorna Oryahovitsa, Elena, Zlataritsa and Starzhitsa with a total population of 180,000. Minister Vassileva pointed out that during the new EU programming period 280 million euro would go for upgrading landfills. After the construction of the state-of-the-art environmental waste management system, five landfills in the region will be closed down. Prime Minister Boyko Borissov said that this was very important for the protection of the environment and of human health and for the development of tourism in the six municipalities.
Bulgaria’s first honorary consulate in Norway was officially inaugurated on October 24, 2025, in the city of Stavanger, the Embassy of Bulgaria in Oslo announced on Facebook. Following the performance of the national anthems of Bulgaria and..
Frol and Frosia are the newest residents of the Bear Sanctuary Belitsa, according to the Four Paws Foundation, which runs the bear sanctuary in cooperation with Foundation Brigitte Bardot. The seven-year-old Frol and Frosia come from Bear Sanctuary..
The “water meter fee” will be removed from the proposed amendments to the Water Supply and Sewerage Services Regulation Act, Minister of Regional Development and Public Works Ivan Ivanov said in an interview with bTV. According to him, the draft law..
An earthquake with a 6.1 magnitude on the Richter scale hit Western Turkey at 22.48 hours last night. There were over 40 aftershocks after the..
Bulgaria’s draft social security budget indicates that the minimum wage from 1 January 2026 will be lower than the level set out in the Labour Code ,..
Bulgaria’s Vertical Gas Corridor project is on track for completion by the end of 2026 , according to Energy Minister Zhecho Stankov, who stressed that..
+359 2 9336 661