The 5th unit of Kozloduy nuclear power plant has been going under a planned annual maintenance and modernization. The unit will be loaded with fresh nuclear fuel during the maintenance campaign. Some measures aimed at extending the life of the 1,000 megawatt reactor will be also fulfilled. Its thermal power is expected to increase with 4% after the annual maintenance. The maintenance of the 5th reactor at Kozloduy NPP will continue until mid June. Currently the 6th nuclear reactor is functioning at its full capacity.
Employees of the Maritsa East 2 Thermal Power Plant, affiliated with the Confederation of Independent Trade Unions in Bulgaria (CITUB) and the “Podkrepa” Labor Confederation, held a silent protest in solidarity with staff from the Bulgarian National..
By the end of the year, Bulgargaz will have to pay an additional €10 million under the contract with Botas due to indexation. This information was reported by BGNES and confirmed by Energy Minister Zhecho Stankov. During the caretaker government of..
Representatives of the Interior Ministry at the highest level and influential politicians are involved in the attempt to foil the operation by the General Directorate for Combating Organised Crime against a cigarette smuggling ring in Plovdiv in..
The nationalist party is holding an event at the National Palace of Culture (NDK) in Sofia today at 6:30 pm, which is being promoted as a discussion on..
An exhibition titled Food and Drink of the Bulgarians: From the Oriental Table to the Canteen opens today at 17:00 at the Archives Exhibition Hall of the..
For a fourth day in a row, the Bulgarian capital remains without surface public transport , as its workers do not get the requested..
+359 2 9336 661