Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Protesters against construction of Rumyantsevo 2 hydroelectric power plant block off traffic along Sofia-Rousse main road

Photo: Plamen Hristov

Anglers and environmentalists from all over the country blocked off traffic for about an hour along the Sofia-Rousse main road. No vehicle queues or traffic jams were formed.  

They are protesting in Rumyantsevo village near Lukovit, against the draining of rivers by small hydroelectric power plants and against the construction of Rumyantsevo 2 hydroelectric power station. The protesters are carrying posters, one of which reads: “We want our rivers and our nature. No more hydroelectric power plants.”

The organizers of the protest – the associations Balkanka and Old Otters – say thatthe construction of Rumyantsevo 2 is illegal. The section of Zlatna Panega River falls within a protected area under Natura 2000. There are many species there which are under the protection of the law, but which will vanish from the river section drained by the hydroelectric power station. Its construction is inadmissible under the Danube River Basin Management Plan 2021.  The protestors are demanding that the National Construction Control Directorate conduct an inspection of the construction documents as well as the immediate stop to the plant’s construction.  

Dimitar Kumanov, member of the management council of the Balkanka association says:

“We are protesting against the illegal construction permit, issued for Rumyantsevo 2 hydroelectric power station which will inflict damages on one of the most valuable sections of Zlatna Panega River and its unique biodiversity. We demand that the National Construction Control Directorate launch an inspection of the construction authorization documents for this hydroelectric power plant. There are several violations – the weir on the river is public state property and they have no established right to use the weir and to reconstruct it – its reconstruction means building, as stipulated by the law. They do not have authorization to use a surface water construction project, which is obligatory for the issue of the above-mentioned construction permit. The court itself ruled: “This is an illegal hydroelectric power plant.”



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

President and Speaker of the Parliament express condolences at the North Macedonian Embassy

We are waiting for North Macedonia to decide whether there is a need to transport 10 more of the Kočani fire victims to Bulgaria. This was what President Rumen Radev said after signing the book of condolences at the Embassy of North..

published on 3/18/25 1:25 PM

Hundreds of people in Sofia donate blood for the victims of the Kocani fire tragedy

Six residents of the town of Kocani from North Macedonia are traveling to the Pirogov Hospital in Sofia to donate blood. They have the rare blood type A, a negative Rh factor, which is urgently needed for one of the patients in serious condition..

published on 3/18/25 11:28 AM

Over 108,000 workers from 64 non-EU countries have come to Bulgaria in 6 years

The import of manpower from non-EU countries is record high, but does not cover the needs of the business sector. Since the beginning of the year, 4,202 third-country nationals have been registered for seasonal employment alone. This is 40% of the..

published on 3/18/25 9:41 AM