Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Consumer Protection Commission bans all sales of Energy Sniff in Bulgaria

The Commission for Consumer Protection has ordered the immediate withdrawal from the market of two products known as energy sniff, which are inhaled through the nose and are an alternative to energy drinks. The products have been identified as a serious..

published on 9/11/24 2:55 PM

Bulgarian Parliament extends negotiations with Ukraine on Russian nuclear equipment by six months

With the votes of GERB, We Continue the Change (PP-DB) and the Movement for Rights and Freedoms (DPS), Parliament decided to extend by 180 days the negotiations between the Bulgarian Energy Minister and his Ukrainian counterpart on the sale to Ukraine of..

published on 9/11/24 2:36 PM

Gallup: Nearly 60% of Bulgarians say they believe in God

75.3% of Bulgarians identify themselves as Orthodox, 9.9% as Muslim and 11% as not religious. 59.5% say they believe in God and 27.5% do not. The rest are undecided. A fifth of respondents say they frequently attend religious services.  These are..

published on 9/11/24 1:57 PM