Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
On Tuesday , the lowest temperatures will be between 8 and 13°C; in Sofia - about 8°C. During the day, it will remain cloudy. There will be rainfalls in some places. The highest temperatures will be between 10 and 15°C; in the..
Bulgaria relies on the efforts of honorary consuls from around the world to help establish new partnerships in the fields of economy, trade, innovation, education and tourism. Our country can become more visible by restoring its positions and building..
North Macedonia has still not adopted the necessary constitutional amendments aimed at including Bulgarians and other non-majority communities in the constitution. This is stated in the annual report of the European Commission on the progress of EU..
It is theoretically possible that Bulgaria could apply for a third payment under the Recovery and Resilience Plan by the end of 2025,..
With the blessing of the Holy Synod of the Bulgarian Orthodox Church, a mobile application for believers has been available on the..
With shouts "No to the euro", about a hundred supporters of "Vazrazhdane" gathered to protest in front of the building of the..
+359 2 9336 661