Bulgarian Prime Minister Boyko Borissov and Azerbaijani President Ilham Aliyev have discussed energy cooperation between Sofia and Baku. "We have been planning to complete the construction of the inter-connector with Greece by 2020 in order to reach the agreed 1 billion cubic meters of gas per year over the TAP gas pipeline." In fact, after 2020, Azerbaijan's natural gas from Shah Deniz 2 will satisfy about 25 -30% of natural gas consumption in Bulgaria, which is a major share and would significantly increase the energy security of Bulgaria, PM Borissov said.
Bulgaria has until 21 November to decide how to proceed with the Lukoil Neftochim refinery, Prime Minister Rosen Zhelyazkov said on Thursday ahead of a meeting of EU leaders in Brussels. He was apparently referring to the end of a US Treasury..
The Bulgaria army will make up for the lack of personnel but not immediately. For 2025, we have money to hire only 1,000 new soldiers, said Defense Minister Atanas Zapryanov before the relevant parliamentary committee. The committee supported the..
Bulgaria remains a net exporter of electricity and one of the pillars of the energy system in Southeast Europe. Electricity exports exceed imports by 3.1% in 2024. According to this indicator, the country ranks 11th in Europe. Among the..
The President of the “Renew Europe” group in the European Parliament, Valérie Hayer, called on the European Commission to urgently send a mission to..
Bulgaria could run into fuel shortages if the Lukoil Neftochim refinery stops operating, former Prime Minister and GERB leader Boyko Borissov warned on..
The Institute for Computer Science, Artificial Intelligence and Technology (INSAIT) at Sofia University ‘St. Kliment Ohridski’ has released SPEAR-1, an..
+359 2 9336 661