The extension of the Turkish Stream gas pipeline will pass through Bulgaria, not Greece, Russia’s Energy Minister Alexander Novak told journalists today at the sitting of the Russia-Turkey Intergovernmental Commission on Trade and Economic Cooperation in Antalya. The gas pipeline which has to connect Russia and Turkey via the Black Sea will start functioning on January 1, 2020. The extension which will pass through Bulgaria, Serbia and Hungary is expected to start functioning in stages. The first gas deliveries to Bulgaria are expected to be made in 2020. The pipeline will have the capacity to transfer 15.75 billion cubic meters of gas per year.
On the occasion of World Health Day (April 7), Bulgaria’s Premier Rosen Zhelyazkov expressed his deep appreciation and respect for doctors and healthcare workers in Bulgaria, BTA reported. “You are the people who, every day, with professionalism and..
On Monday there will be snow showers or a mix of rain and snow in many places. The precipitation will decrease and stop, and the clouds will clear in the evening. The minimum temperature will be minus 3°C, around minus 1°C in Sofia, and the maximum will..
After a fire destroyed the roof of the historic National High School of Applied Arts in Tryavna on Friday morning, students are taking a week-long emergency break. With the help of the fire brigade, civil protection teams and local businesses, the..
The path to the economic prosperity of the Roma people goes through cultural legitimacy, says Ognyan Isaev, director of the Educational Opportunities..
The Ministry of Justice has published for public discussion a package of legislative changes against delay in serious road accident cases. These..
House prices in the EU rose by 4.9% in the fourth quarter of 2024 compared with the same period in 2023, according to data from the European statistics..
+359 2 9336 661