A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Sofia Airport operates normally in winter conditions, BTA has reported. The runways for take off and landing have been cleaned. The aircraft are being treated against icing. Passengers are advised to arrive at the terminals at..
Speaking to the Bulgarian National Radio, the ambassadors of Germany and France to Bulgaria Irene Plank and Joël Meyer commented on the current situation in Europe and the upcoming negotiations on Ukraine. "This is an informal..
The Bulgarian Ministry of Tourism will work to create a map of important, but hard-to-reach tourist and cultural-historical sites. The goal is then to insist on financing the necessary repairs and improvements that will facilitate visitors' access to..
Kristiyan Vladov and Stefan Kyurkchiev of the Plovdiv Museum of Natural History are working on a project to bring live fish from the southern Arctic..
The one-year anniversary of the death of Russian opposition leader Alexei Navalny was marked with a memorial service in Sofia's St Nedelya Cathedral. It..
Expanding connectivity between Bulgaria and Turkiye is an investment in the development of the entire region, President Rumen Radev said at a meeting..
+359 2 9336 661