A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Bulgaria’s Employment Agency reported a stable labour market in September, with the registered unemployment rate standing at 5.06%, down from 5.2% in August. Around 17,000 people found jobs through labour offices during the month, nearly 3,000 of..
Three Air Force officers were presented with the Presidential Badge of Honor, BTA reports. The head of state presented the award to Major General of the Reserve Ivan Parapunov, Lieutenant Colonel Stefan Stefanov and Major Dimitar..
Early elections will not help anyone. If elections were held now, the caretaker government would have no power to draft the most difficult budget in the past 30 years. This was what the president of the Confederation of Independent..
The Bulgarian National Radio will host the 2025 Public Broadcasters International (PBI) Annual Conference . The prestigious forum will be held from..
On Saturday, minimum temperatures will range from 8 to 13°C , around 9°C in Sofia. It will be mostly cloudy with rain in many areas. There will be..
Bulgaria has received its fourth air ambulance helicopter. “The new aircraft will be based at the Georgi Benkovski Air Force Academy hangar in Dolna..
+359 2 9336 661