The contract between Lockheed Martin and the United States Air Force for the production of the F-16 Block 70 aircraft is expected, Bulgaria's Ministry of Defence has commented. The announced deadline for implementation, January 2027, is in line with the intergovernmental agreement between Bulgaria and the USA. The first 2 aircraft must be delivered to Bulgaria in mid-2023 and the last 2 at the beginning of 2024. After the delivery of the aircraft, a 3-year maintenance period for the equipment and systems begins. It ends in early 2027, reads the information from the Ministry of Defence.
The international scientific conference “Bulgarians in the Northern Black Sea Region” will be held in Sofia on October 27 and 28, 2025 in the Institute of Ethnology and Folklore with Ethnographic Museum at the Bulgarian Academy of Sciences, Prof...
The annual planned maintenance of Kozloduy NPP Unit 6 starts today and is expected to last until early December, the nuclear power plant has announced. During the shutdown, technical maintenance of the systems and facilities will be carried out,..
Saturday will start off with lows between 6°C and 11°C, dropping to around 6°C in Sofia. Skies will brighten for a time over northern Bulgaria before turning cloudy again later, with rain moving in by evening and overnight. Cloudy spells are also..
The international scientific conference “Bulgarians in the Northern Black Sea Region” will be held in Sofia on October 27 and 28, 2025 in the Institute..
+359 2 9336 661