In a joint analysis, the Dusseldorf Institute for Macroeconomics, the Vienna Institute for International Economic Studies WIIW and the French OFCE Institute have called on the EU to invest the billions planned for recovery from the Covid-19 crisis in two key projects.
The first is for a trans-European high-speed railway to connect all European capitals and the second for a "European Silk Road" to Moscow and the countries of the Caucasus. Both projects have key routes through Bulgaria. 853 km of "Ultra-Rapid-Train" or "Trans Europa Express" must pass through Bulgaria, and the cost of the Bulgarian section is 59% of the current GDP of the country, the analysis shows. A total of 18,250 km in the EU would cost 1,1 trillion euros.
The documentary film "The Heart of the Other Bulgaria" by journalist Milena Milotinova had its premiere at the Central Military Club in Sofia. The film is dedicated to the 30th anniversary of the State Agency for Bulgarians Abroad. The documentary is..
Exhibitions of traditional rugs and clothing from the beginning of the 20th century, a bazaar of handicrafts and agricultural products, a competition for the best home-made rakia and a rich music program are part of the first day of..
The 13th International Festival for Street and Puppet Theater "Puppet Fair" opens at the Sofia Puppet Theater (14 General Gurko Street). The festival, which will run until September 21, is non-competitive. Professional theatres from the country and..
Defence Minister Atanas Zapryanov has cancelled the air show at the Graf Ignatievo Air Base after an L-39 ZA military transport plane crashed, the..
The Supreme Administrative Court rejected the appeal of the coalition around Ahmed Dogan - "Democracy, Rights and Freedoms - DPS"..
At a Bulgarian-Chinese business forum in Sofia, President Rumen Radev pointed out the advantages of the business environment in..
+359 2 9336 661