The construction of Balkan Stream gas pipeline has actually been completed- its Bulgarian and Serbian sections have been connected, the Russian news agency TASS informs without quoting its source of information. According to the same source which is taking part at the construction of the pipeline, the official inauguration ceremony is postponed due to the coronavirus epidemic, BGNES reports.
Balkan Stream is an extension of Turk Stream gas pipeline project. The Bulgarian-Serbian section will allow additional supplies of Russian natural gas for Serbia and Hungary. The extension was named Balkan Project at the proposal of Bulgaria’s Premier Boyko Borissov. The pipeline is 474 kilometers long and will have the capacity to transfer up to 20 billion cubic meters of gas per year.
On Wednesday, the minimum temperatures in Bulgaria will be from 11 to 16°C, in Sofia - 14°C . A cold atmospheric front will pass through the country, with cloudiness being more often significant. From the northwest to the southeast, it will rain in..
In addition to using EU funds, accelerating the development of key infrastructure projects can be achieved through concession mechanisms. This is a tool that the European Commission encourages. This was what Deputy Prime Minister and Minister of..
The sixth unit of the Kozloduy NPP will also start operating with American nuclear fuel next year. The first six Westinghouse cartridges will be placed in the reactor to determine their effect on electricity production. This became clear at a..
Motorway Europe-A6, which is 63 kms. long, has been put into operation. Connectivity between the Orient and Western Europe is now a fact, Minister of..
Bulgaria is ready to down Russian drones. The Northeastern part of the country is actively being monitored, Minister of Defence Atanas Zapryanov..
In order for young people to be adequately prepared for the challenges of contemporary life and the demands of today’s labour market, education needs to..
+359 2 9336 661