The construction of the first seventeen kilometer-long section of Europe motorway connecting the towns of Dragoman and Slivnitsa has been completed, Road Infrastructure Agency announced, BTA informs. Construction works ended six months ahead of schedule. The section is part of the Pan-European corridor London-Budapest-Belgrade-Sofia-Plovdiv-Istanbul-Calcutta, which is the shortest road connecting Western Europe, the Near East and the Middle East.
Europe motorway connecting Kalotina border crossing and Bulgaria’s capital Sofia is 48 kilometers long. Construction of the 14.5 kilometer section between the Bulgaria-Serbia border and the town of Dragoman continues.
The third section of the motorway between Slivnitsa and Sofia will be 16 kilometers long. The technical design of the new section is being prepared.
The branch of the European Public Prosecutor's Office in Sofia has indicted two individuals suspected of fraud for EUR 66,750. The money comes from the European Social Fund and state co-financing, reported BNR’s correspondent in Brussels Angelina..
The Ministry of Foreign Affairs has advised Bulgarian citizens to avoid traveling to Greece because of a planned national strike today. The Foreign Ministry advises people to check the situation in Bulgaria's southern neighbor and the timeliness of flight..
"We hope that by the end of next week, the calculations will be completed and the results will be submitted to the Constitutional Court", Central Election Commission (CEC) Deputy Chair Rositsa Mateva told public broadcaster BNT regarding the..
The effects of the protests against supermarkets are being felt, Agriculture Minister Georgi Tahov said in Plovdiv, where he was attending a national..
In 2022, 14.7% of workers in the EU were low-wage earners . By definition, low-wage earners are those who earn two-thirds or less of the average gross..
A serious restrictive and even repressive attitude among Bulgarian society on the current issues of school education and upbringing is shown by an..
+359 2 9336 661