Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Start of Azeri gas deliveries to Bulgaria

Photo: archive

Natural gas deliveries from Azerbaijan to Bulgaria are beginning as of today, 31 December.

Until 1 October, 2021, the gas will flow via the Nea Mesimvria point in Greece’s gas transmission system. After that it will pass along the Komotini-Makaza gas interconnection Greece – Bulgaria (IGB).  

Under the contract concluded, Bulgargaz is to receive 1 billion cubic metres of natural gas a year from the Shah Deniz 2 gas field over a period of 25 years, the BTA reports.

The transaction was concluded in accordance with the policy of the Bulgarian government aimed at diversifying the sources and the supply routes of natural gas, guaranteeing the safety of the deliveries and providing competitive prices for Bulgarian consumers. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Rosen Zhelyazkov

Premier Zhelyazkov: The defence capabilities of the European Union and NATO must be strengthened

''Sabotage groups are operational in Bulgaria, and they exert hybrid influence and are part of Bulgaria's political life'', Prime Minister Rosen Zhelyazkov said in Parliament in response to a question about whether there is data on hybrid attacks and..

published on 10/3/25 12:34 PM

Burgas Municipality declares a partial state of emergency due to heavy rainfall

The Municipality of Burgas has declared a partial state of emergency until October 6. Mayor Dimitar Nikolov said that evacuations will be carried out in the areas most affected by the heavy rainfall, if necessary.  The measure was introduced due to..

published on 10/3/25 11:11 AM
Tomislav Donchev

50% of all funds under the operational programs have been contracted, says Deputy Premier Tomislav Donchev

''Funds disbursed under all EU operational programs amount to 3.3 billion BGN (1.587 billion EUR). A total of 12 billion BGN (5.770 billion EUR) has been contracted, representing 50% of the total funding. Contracting has accelerated by 50%, and..

published on 10/3/25 10:51 AM