Equipment for the project for Bulgaria’s second nuclear power plant of Belene could be used for building a seventh unit of Kozloduy NPP, Prime Minister Boyko Borissov has said.
Bulgaria has already paid about 0.7 billion euros for the equipment under the Belene project, after which it tried to sell it to Iran but the attempt was not successful.
According to expert reports, it is economically, environmentally and technically possible for the equipment provided for the Belene NPP to be used for a new unit at Kozloduy. However, such a move must be agreed with the Russian side, as the equipment was designed by Russian company Rosatom.
Studies on the construction of a second nuclear power plant in Bulgaria started in the early 1970s and the saga continues to this day.
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661