After 01.00 on January 22, Unit 5 of Kozloduy NPP was disconnected from the country's energy system. The reason is the activation of protection system during routine operations. There is no deviation from the normal radiation situation, the nuclear power plant reported. There is no leakage of radiation and reason for concerns, the chairman of the Bulgarian Nuclear Regulatory Agency Tsanko Bachiyski has told BNR's Horizont program.
He expects the unit to start operating by the end of the day. Load of hydroelectric and thermal power plants has been increased to compensate for the electricity of the unit. There is no need to import electricity, as currently domestic consumption is not high, the electricity system operator added.
Sofia will now have night public transport connecting the centre with Vasil Levski Airport , according to the press centre of the Sofia Municipality. Starting on 14 July, night bus line No. 4 will run, extending its current route from the Gotse..
“Prime Minister Hristijan Mickoski’s narrative will be left to those familiar with Aesop’s fables,” Bulgarian Prime Minister Rosen Zhelyazkov commented in Rome, where he attended the Fourth Ukraine Recovery Conference. “North Macedonia must adhere to..
Bulgaria has consistently and unwaveringly supported Ukraine since the outset of the war, Bulgarian Prime Minister Rosen Zhelyazkov told Ukrainian President Volodymyr Zelensky during their meeting at the Fourth Conference on the Recovery of Ukraine ...
+359 2 9336 661