After 01.00 on January 22, Unit 5 of Kozloduy NPP was disconnected from the country's energy system. The reason is the activation of protection system during routine operations. There is no deviation from the normal radiation situation, the nuclear power plant reported. There is no leakage of radiation and reason for concerns, the chairman of the Bulgarian Nuclear Regulatory Agency Tsanko Bachiyski has told BNR's Horizont program.
He expects the unit to start operating by the end of the day. Load of hydroelectric and thermal power plants has been increased to compensate for the electricity of the unit. There is no need to import electricity, as currently domestic consumption is not high, the electricity system operator added.
On Friday, the National Assembly will vote on a no-confidence motion against the cabinet of Prime Minister Rosen Zhelyazkov over ''failures in environmental and water policy''. The fourth no-confidence motion against the current government was tabled..
The Speaker of the Parliament of Albania, Elisa Spiropali, has arrived in Bulgaria for an official visit. The two-day visit is at the invitation of National Assembly Speaker Natalia Kiselova . Elisa Spiropali was welcomed at the airport by the..
Tuition fees at state universities should not exceed 75% of the expenses for the training. This was what MPs decided with amendments to the Higher Education Act adopted on Wednesday at first reading. It is expected that after the..
+359 2 9336 661