“Kozlodyu NPP-New Build” Plc and NuScale Power LLC have signed a memorandum of understanding to consider deploying NuScale’s small modular reactor technology at the Kozlodyu site, two companies announced.
The document implements the cabinet’s decision, taken on November 14, 2020, to study the possibility of building another nuclear facility at Kozlodyu nuclear power plant in the context of the EU targets to ensue energy diversification and climate neutrality by 2050.
The memorandum of understanding is a proven commercial practice for projects of mutual interest which does not impose obligation for future investment decision or financial costs, reads the joint statement.
On Wednesday, minimum temperatures will range from 8 to 14°C. In Sofia, it will be around 8°C. During the day, cloud cover will increase from west to east, with light rain possible in some western areas before noon. There is a heightened probability of..
Bulgaria’s President Rumen Radev met in Tokyo with Japan’s Prime Minister Shigeru Ishiba as part of his visit to Japan. Rumen Radev and Shigeru Ishiba signed a joint declaration on elevating bilateral relations between Bulgaria and Japan to the level..
Only 2 kilometers remain to be built on the Bulgarian side of the railway corridor known as Corridor No. 8, which is intended to connect the Adriatic Sea with the Black Sea through Albania, North Macedonia and Bulgaria, Permanent Secretary of the..
Public transport in Sofia will resume as of Tuesday, May 20, Todor Kapitanov, Vice President of the Confederation of Independent Trade Unions in Bulgaria..
The government has agreed to provide an additional €7.7 million in subsidies for Sofia's public transport. This was agreed at a meeting today between..
Protesters in support of the preservation of the Bulgarian lev temporarily blocked traffic in the center of the Bulgarian capital Sofia on Sunday..
+359 2 9336 661