Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Power produced by Kozloduy NPP's Unit 6 temporarily halved

Photo: BGNES

Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.

The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Nesebar on the Black Sea coast covered in snow

During the weekend temperatures will vary widely above and below zero

On Saturday the weather will continue cold, predominantly sunny with a temporary increase of mid and high clouds. There will be fog before midday in some parts in the lowlands. There will be a light wind from the East, in the Eastern part of..

published on 2/21/25 7:35 PM
Rumen Radev

Survey: President Rumen Radev with highest approval rating

Out of all politicians in this country, President Rumen Radev enjoys the highest approval rating – 46.7% , followed by Prime Minister Rosen Zhelyazkov (18.9%), GERB party leader Boyko Borissov (15.9%), National Assembly Speaker Nataliya Kiselova..

published on 2/21/25 4:44 PM

74% of young doctors choose to remain in Bulgaria

For the third year running, the number of young doctors who want to remain in Bulgaria after graduation has been going up, indicate the results of a survey conducted among 224 Bulgarian students who graduated the Sofia Medical University’s medical..

published on 2/21/25 2:47 PM