Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Power produced by Kozloduy NPP's Unit 6 temporarily halved

Photo: BGNES

Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.

The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

A warning for dangerous rainfall has been issued for 12 regions in Southern Bulgaria

On Friday, the lowest temperatures will be between 4°C and 9°C, reaching up to 12°C in the southeast, around 6°C in Sofia . During the next 24 hours, the weather will remain cloudy. It will rain in almost the entire country. During the day, rainfall..

published on 11/27/25 6:45 PM

Varna mayor Blagomir Kotsev released pending trial on €102,258 bond

The Varna District Court has released the city’s mayor, Blagomir Kotsev, on a financial bond of €102,258. Before the court’s decision was announced, supporters of the mayor and members of the We Continue the Change party gathered outside the..

published on 11/27/25 5:37 PM

Three detained and five police officers injured at last night's protest in Sofia

Three people, including an Italian citizen, were arrested during last night's protest against the adoption of the 2026 budget in front of the National Assembly, the director of the Sofia Directorate of Internal Affairs, Chief Commissioner Lyubomir..

published on 11/27/25 3:50 PM