Infringements have been ascertained in one third of the more than 1,500 public procurement procedures, amounting to 1.2 billion Leva, which have undergone review, according to the Institute for Market Economics which cites the 2020 annual report of the Public Financial Inspection Agency.
In half of the contracts the violations are significant – inappropriately conducted procedures, conditions set down by the contracting entity which give an advantage or unjustifiably restrict bidders’ participation, price and deadline changes by way of annexes to public procurement contracts, non-awarding of public contracts where all legal grounds are at hand. The experts say that last year saw a drop in the number of tainted contracts.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661