Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Outage of Kozloduy NPP’s reactor 6 for preventive maintenance

Photo: Kozloduy NPP

An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.

The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.

The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Dobrudzha horo dances in the village of Branishte

The beginning of the eleventh “horotheque” in the village of Branishte near Dobrich will be set today at the local stadium, where a 50-meter flag will be raised. The Bulgarian flag will be twice as large as last year's, the mayor of..

published on 5/18/25 7:05 AM

Sunny Sunday with slightly higher temperatures

On Sunday it will be mostly sunny. The lowest temperatures will be between 4° and 9°C; in Sofia 3°-4°C. The highest temperatures will be between 18° and 23°C, in Sofia – around 19°C. In the mountains it will be mostly..

published on 5/17/25 7:00 PM

Thousands of Sofia citizens support introduction of “Virtues and Religions” in schools

A crowded procession in support of the introduction of the subject “Virtues and Religions” in schools took place in the center of Sofia. It was organized by civil organizations with the blessing of the Holy Synod. At the..

published on 5/17/25 4:14 PM