There are two dates set down in the recovery and resilience plan, adopted by the government, for the closure of the coal-fired power stations – 2038 or in 2040, caretaker Prime Minister Stefan Yanev announced.
“The mechanism of fixing these dates is yet to be finalized on the basis of technical analysis. If the date can be after 2040 – then so be it. But let’s not juggle dates around and scare people. Quite the opposite, what we want is predictability,” PM Yanev said.
“A great deal of work has gone into the document over the past 5 months. The plan was discussed with the 46th National Assembly and with the affected organizations from the industry,” Stefan Yanev added.
The plan is to be submitted to the European Commission for discussion and negotiation on 15 October.
There is a potential danger of a wave of migrants, caretaker Prime Minister Dimitar Glavchev said at a briefing after the meeting of the Consultative Council on National Security , at which the risks to this country stemming from the..
At the moment, there is no direct threat to our country stemming from the sharp deterioration of the security environment in the Middle East, President Rumen Radev announced after the three-hour meeting of the Consultative Council on..
We must be prepared for the worst-case scenario because the situation is escalating after Iran’s direct attack against Israel, said caretaker Minister of Defence Atanas Zapryanov for public service TV BNT. “We have response steps which is the next..
Charges of trading in influence are to be brought against Dzheyhan Ibryamov after decisions were made to strip him of his immunity from prosecution..
If the general elections were to be held at the beginning of October, 6 parties and coalitions would enter the Bulgarian parliament, a Market Links..
What is the noise level of an airplane engine or a hand drill, a normal conversation, the movement of a car at a speed of 60 km/h, in a disco, at a..
+359 2 9336 661