I have not promised to build a bridge in four years, because this is impossible, Bulgaria’s Minister of Regional Development and Public Works Grozdan Karadzhov said for Nova TV in connection with the announcement of this country’s Minister of Finance Assen Vassilev that Bulgaria would build 4 bridges over the Danube by the end of the term of office of the current cabinet. In Minister Karadzhov's words, the construction of a bridge takes a minimum of 6 years.
In his words, Struma motorway will not cross the Kresna Gorge via a tunnel, as proposed by this country’s Minister of Environment. Grozdan Karadzhov defended the current project which envisages that one of the routes of Struma motorway will pass through the Kresna Gorge and the other one will pass along the mountain ridge. The project will cost EUR 500 million and can be completed in 2028. The construction of the tunnel is four times more expensive, Minister Karadzhov added.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661