Sofia municipality is to hold a public discussion, at 3 PM on 18 February on the WEBEX online platform, on taking out a loan from the European Investment Bank for the extension of the Sofia metro, Deputy Mayor Doncho Barbalov has announced. The discussion will also be streamed live by the municipality on its YouTube channel.
The loan is for EUR 195.5 million, 56 million of which for the 3 km section, plus 3 metro stations from Hadzhi Dimitar to Levski residential area. The 6 km. diameter to Tsarigradsko Shose with 6 stations, will cost EUR 139.5 million.
47% of the money for the two lines will come from European funding under the recovery and resilience plan. The rest will be co-financed by the municipality via the loan. No debt security is envisaged.
Children’s right to education and adults’ right to access to the workplace are restricted.” This is stated in the position of the Union of Principals within the System of Public Education in Bulgaria on the occasion of the effective..
Work is currently underway to establish a network of “Shops for the People,” Agriculture Minister Georgi Tahov announced at a meeting of the relevant parliamentary committee in response to a question about the progress of work on..
An exhibition titled Food and Drink of the Bulgarians: From the Oriental Table to the Canteen opens today at 17:00 at the Archives Exhibition Hall of the State Archives Agency, located at 5 Moskovska Street in Sofia. The exhibition explores the history..
For the third day in a row, Sofia will remain without ground public transport, the Center for Urban Mobility announced on its Facebook page. After a..
The leader of “Vazrazhdane”, Kostadin Kostadinov, told journalists in the National Assembly that President Rumen Radev should ask the Constitutional..
The protest of ground public transport workers in Sofia continues for a second day with demands for higher wages. Protesters are demanding a salary..
+359 2 9336 661