The Interconnector Greece-Bulgaria (IGB) has been hooked up to the Trans-Adriatic gas pipeline (TAP). The tie-in was completed with two golden welds, connecting a gas metering station at Komotini with TAP's existing infrastructure.
The successful connection of the infrastructure of the two energy projects is key to the completion of the next stage and to the commercial launch of the IGB which was planned for later this year. This was announced by the joint investment company which is building the interconnector.
IGB connects Bulgaria to the Trans-Adriatic gas pipeline which allows natural gas to be transported from Azerbaijan via Greece to Italy and the South-East European region.
On Wednesday, the minimum temperatures in Bulgaria will be from 11 to 16°C, in Sofia - 14°C . A cold atmospheric front will pass through the country, with cloudiness being more often significant. From the northwest to the southeast, it will rain in..
In addition to using EU funds, accelerating the development of key infrastructure projects can be achieved through concession mechanisms. This is a tool that the European Commission encourages. This was what Deputy Prime Minister and Minister of..
The sixth unit of the Kozloduy NPP will also start operating with American nuclear fuel next year. The first six Westinghouse cartridges will be placed in the reactor to determine their effect on electricity production. This became clear at a..
Bulgaria is ready to down Russian drones. The Northeastern part of the country is actively being monitored, Minister of Defence Atanas Zapryanov..
Motorway Europe-A6, which is 63 kms. long, has been put into operation. Connectivity between the Orient and Western Europe is now a fact, Minister of..
In order for young people to be adequately prepared for the challenges of contemporary life and the demands of today’s labour market, education needs to..
+359 2 9336 661