Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Trade unions concerned about Bulgaria's energy security

Photo: BGNES

The commitment to reduce carbon emissions from electricity electricity production by 40% by 2026 compared to 2019 in the energy section of the Recovery and Sustainability Plan includes binding short-term steps

According to the Confederation of Independent Syndicates in Bulgaria (CISB), these commitments raise concerns for the country's energy security as they cannot realistically contribute to recovery and sustainability in the sector. Moreover, it is not clear what the reforms in the sector will be after 2030. The trade union insists that the commitment should be reviewed as it binds the country to conditions for deep changes in Maritsa East Mines as soon as the next 3 years.

On the other hand, the separation of the state-owned companies in the energy sector from the Bulgarian Energy Holding, scrapping NEK EAD as a public supplier and the liberalization of the retail market will lead to the alignment of household prices with those on the free market, which will be beyond the means of the majority of households, the trade union predicts. 

According to the syndicate's experts, the "battery arrays" project has not been included as an option in any strategic analysis of the sector's development in the country discussed in recent months and it is therefore appropriate to limit its scale.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM
Rositsa Mateva

63 polling stations did not have required CCTV coverage

In 63 polling stations out of a total of 11 626 polling stations that should have been equipped with CCT V, there was no live video feed and recording of the 27 October snap elections. This was announced by the deputy chairperson and spokesperson of the..

published on 11/4/24 2:12 PM