Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP Unit V shut down for planned repairs

Unit 5 of Kozloduy Nuclear Power Plant.
Photo: BGNES

Unit 5 of Kozloduy Nuclear Power Plant will be shut down today for an annual scheduled maintenance. The works will last until the end of May. 
The disconnection of the unit's turbine generator from the country's electricity system is coordinated with the Electricity System Operator. 
Regular and routine maintenance of the unit's equipment and systems will be carried out, as well as specialized tests, inspections and checks. The unit's reactor will be refueled with fresh nuclear fuel for the upcoming fuel campaign.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Georgi Klisurski

Resignations in PP-DB continue

Former Deputy Minister of Finance Georgi Klisurski from "We Continue the Change" (PP) announced that he was leaving the party. In a Facebook post, Klisurski wrote: "I am leaving the PP. Disappointed and disgusted." His colleague in..

published on 6/26/25 9:20 AM

Experts gather in Pamporovo for scientific conference on climatotherapy

From June 26 to 28 th , the Second National Scientific Conference will be held in the Pamporovo mountain resort. The topic of the forum is "The Role of Climatotherapy Resorts for Health - The Example of Pamporovo". Among the..

published on 6/26/25 7:35 AM

International regatta Ultramarine Balchik Match Race starts

Balchik is hosting the international regatta Ultramarine Balchik Match Race from the calendar of the European Match Race Tour (EMRT), BTA has reported. The race will be held from June 26 to 29. Teams from Bulgaria, Poland,..

published on 6/26/25 7:10 AM