The energy regulators of Bulgaria and Greece have certified the Gas Interconnector Greece–Bulgaria (IGB).
The commercial exploitation of the interconnector is set to begin after 1 July, 2022. IGB is of strategic importance and allows for the linking of the Greek and the Bulgarian gas transmission systems, diversifying gas supplies to Bulgaria and Southeastern Europe. The interconnector will enable Bulgaria to receive, in the second half of 2022, the full amount of the 1 billion cubic metres of natural gas negotiated with Azerbaijan. The pipeline’s transmission capacity is 3 billion cubic metres, and will allow delivery of liquefied gas from USA, Algeria, Qatar, Egypt, Nigeria, Israel and Cyprus.
The papers have to be approved by the European Commission, in accordance with European norms, before the certificates enter into force.
Customs officials have seized a record 120 kg of gold at the Kapitan Andreevo checkpoint on the border with Turkey. Gold bars, coins and jewellery were seized. The driver, a Bulgarian national, was arrested and charged. Another man with Bulgarian and..
Defence Minister Atanas Zapryanov has cancelled the air show at the Graf Ignatievo Air Base after an L-39 ZA military transport plane crashed, the Defence Ministry said. The accident occurred during preparations for tomorrow's demonstrations to..
Bulgaria has always been open to dialogue with North Macedonia and expects that this dialogue will contribute not only to our cultural rapprochement, but also to the strengthening of economic cooperation. We expect that this dialogue will finally..
Overnight, from west to east, the rain showers will stop and the clouds will break up and decrease. Thursday will be sunny in western and central..
The Supreme Administrative Court rejected the appeal of the coalition around Ahmed Dogan - "Democracy, Rights and Freedoms - DPS"..
At a Bulgarian-Chinese business forum in Sofia, President Rumen Radev pointed out the advantages of the business environment in..
+359 2 9336 661