“Bulgaria urges Romania to agree to the exploration, simultaneously, of the five possible points for the construction of more bridges over the Danube between the two countries. The Ministry of Transport in Sofia is contemplating giving the construction of such bridges and of part of the road infrastructure under concession,” Transport Minister Nikolay Sabev says in an interview with 24 Chasa newspaper.
The consulting bank that has already been selected for the concessions is in contact with the consortium of two Turkish and two South Korean companies which built the 3.5 kilometre-long bridge over the Dardanelles in the space of 4 years. The concession period includes the period of construction so that the investors have an interest in constructing the facilities more quickly, Minister Sabev said.
Around 4 billion euros in debt have been raised from international markets through two bond issues, market analysts confirmed to BNR. The amount was raised through issues of 9-year and 13-year bonds – marking the country’s first entry into the..
Natural gas prices are expected to fall by about 14% from current levels, Bulgargaz CEO Veselin Sinabov told a public meeting of the Energy and Water Regulatory Commission (EWRC). This means that one megawatt hour will cost 31.91 euro, compared to 36.88..
The Bulgarian National Bank (BNB) has revised upwards its expectations for Bulgarian economic growth in 2025 but lowered its GDP growth forecast for 2026, it transpired from the Bank's regular quarterly Macroeconomic Forecast. In its March..
+359 2 9336 661