Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Maritsa-Iztok 3 coal-fired power plant reopens after being closed over air pollution

The Maritsa-Iztok 3 TPP
Photo: BGNES

Maritsa-Iztok 3 coal-fired power plant in Dimitrovgrad has been functioning since last night, BNR’s correspondent Dora Atanassova reports.

The thermal power plant was closed down at the end of April over air pollution, which triggered protests by the TPPs staff. Two days ago the court annulled the suspension of its operation but yesterday Minister of Environment and Water Borislav Sandov updated Maritsa-Iztok 3’s integrated permit, enhancing the requirements in accordance with European legislation. Minister Sandov pointed out that the operator has only partially fulfilled the requirements. For Maritsa-Iztok 3 to be made operational it has to meet the requirements set down. Activists from the movement “Breathe Dimitrovgrad!” got together last night in front of the TPP building when they saw it was operational. “We are not against the TPP working but it must work according to the rules,” they said.

“The power plant has been made operational in accordance with the court decision,” said Maritsa 3’s chief legal officer Julian Semerdjiev. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Blind ultrarunner Victor Asenov inducted into the Everesting Hall of Fame

Blind ultrarunner Victor Asenov has officially become part of the Everesting Hall of Fame, Sportal.bg reports. Between March 21 and 23, the ''Invictus'' Victor Asenov completed 19 consecutive ascents from Aleko Hut to Cherni Vrah Mount on..

published on 4/18/25 3:59 PM

Bulgaria has asked to withdraw its request to the EC for the second payment under the Recovery and Resilience Plan

Bulgaria has asked to withdraw its request to the European Commission for the second payment under the National Recovery and Resilience Plan, the Commission confirmed to BNR. The request was submitted yesterday following coordination with the..

published on 4/18/25 1:04 PM

Border Police: Traffic on the Danube Bridge in Ruse is limited to one lane

Border Police remind that major repairs are underway on the Bulgarian section of the Danube Bridge in Ruse, and because of this, a temporary traffic organization has been implemented. Traffic is in one lane with a regulated flow, controlled by the..

published on 4/18/25 10:41 AM