The Directorate for National Construction Control (DNCC) has issued a total of 11 penal decrees for illegal construction in two sections of Hemus motorway. Construction was carried out without approved investment projects and without a construction permit.
During the inspections it was found that construction works were being carried out on state, municipal and private property for which expropriation proceedings had not been completed as of the date of the inspection.
The criminal proceedings for Hemus Motorway started at the end of last year when acts of administrative violation were served on the contractor Avtomagistrali EAD and the construction companies with which it had concluded contracts for the two sections of the highway.
During an operation by the General Directorate Combating Organized Crime on February 6, three Bulgarians were arrested for participating in an international criminal group operating on the territory of the European Union. A..
The idea of a price ceiling for basic food products has not yet been discussed with the partners in the ruling coalition. According to Prime Minister Rosen Zhelyazkov, direct state intervention in the market for basic consumer..
Bulgaria has paid 11% of the available funds under the EU's Recovery and Resilience Programme. This is less than 700 million euros for 4 years, Deputy Prime Minister Tomislav Donchev said in parliament. At the end of 2023, a..
In connection with the incident involving a drone intercepted in the vicinity of Sofia Airport last night, deputy Prime Minister and Minister of..
Citizens of Serbia gathered on February 9 for a 15-minute silent protest under the slogan “Sofia supports the students” in front of the Serbian embassy in..
The Bulgarian identity card won first place for best ID card in Europe for 2024 at the High Security Printing EMEA-2025 conference in Basel,..
+359 2 9336 661