“If the needs and demands exceed the capacity of the Greece-Bulgaria gas interconnector at Komotini, which amounts to 5 billion cubic metres of gas annually, it is possible to build a second pipe that would meet the growing demand,” Teodora Georgieva, Executive Officer of the project company ICGB which is in charge of the Greece-Bulgaria interconnector, says in an interview for Trend news agency of Azerbaijan.
“For the purpose, ICGB will have to strictly follow the regulatory obligations and processes, conduct the necessary market tests in conjunction with the gas operators connected, and ultimately, to make such a decision if it proves to be feasible from a market and from an economic point of view,” Teodora Georgieva says.
Most Bulgarians (60%) are optimistic about the future of the EU. The EU-wide figure is 65%, according to a Eurobarometer post-election survey published by the European Parliament. Positive attitudes towards the Community are also high - more..
Daily Mail Online published a letter from former teacher Simon Hill under the title “I’m living the Bulgarian retirement dream”. The retiree and his wife own two properties in Bulgaria. They get better healthcare, enjoy hot summers and ski in the..
Bulgaria and the United States are to expand the scope of their Intergovernmental Agreement for cooperation on the project for the construction of a new unit at the Kozloduy Nuclear Power Plant and the civil nuclear programme. This possibility was..
In December this year the Ministry of Finance will have covered the last of the criteria for accession to the Eurozone – inflation, said caretaker..
On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest..
30 buildings across the country will be illuminated in green tonight to mark European Donation Day – the European Day for Organ, Tissue and Cell..
+359 2 9336 661