Despite the tensions arising from the tight deadlines, the government is making efforts so that the construction of the gas interconnector with Greece may be finished as soon as possible, caretaker Minister of Regional Development and Public Works Ivan Shishkov said, and added that all documents connected with the construction of the Bulgaria – Greece interconnector, carried out so far, should be received by the end of next week. Minister Shishkov expressed the hope that the construction work on the connection will be completed by mid-September, the more serious work remaining being that on the section in Haskovo region.
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661