After Unit 6 of the Kozloduy Nuclear Power Plant was put into operation, a leak was ascertained in the coolant system of the electricity generator. Tests are being conducted to identify the cause of the problem, Minister of Energy in the caretaker government Rossen Hristov said for bTV.
“Until the leak is eliminated, the unit will remain disconnected from the national electric energy grid. There is no change in radiation levels. The problem is technical and it is in the non-nuclear part of the system. The reactor is in normal mode,” Minister Hristov said, and added that he hoped the deadline for completing the scheduled annual maintenance – 3 November - will be met.
Borislav Sarafov meets all the requirements and has the qualities to be elected Prosecutor General. This position was taken by the committees on attestation and competitions and on professional ethics at the Prosecutors College of the..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian Augustus, announced Prof. Lyudmil Vagalinski who is in charge of the excavations...
President Rumen Radev, who is paying an official visit to Vietnam, delivered a lecture on the occasion of the 75 th anniversary since the establishment of diplomatic relations between the two countries at the Diplomatic Academy of the Ministry of..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
+359 2 9336 661