There have been indications of reactor coolant leakage in a steam generator in the process of operation of Unit 6 of Kozloduy nuclear power plant. No levels exceeding the radiation safety limits were reached. The nuclear unit will be disconnected from the energy grid if radiation safety limits are reached. The amount of leakage is being constantly monitored. The current level is several times lower than the limitations," Kozloduy NPP said in a statement.
There has been no change in the radiation background in the working premises and at the nuclear plant site. The removal of the leak will not lead to any change in the radiation background, Kozloduy NPP also said.
“I call on all representatives of the Movement for Rights and Freedoms in local government — mayors and municipal councilors — to ensure security and predictability for the people and to take the necessary steps to keep all local taxes and fees..
Bulgaria has climbed to 11th place in this year’s Digital Quality of Life 2025 (DQL) index published by Surfshark, up from 18th last year, BTA reported. The index evaluates countries’ digital well-being across five dimensions: fixed broadband..
Around 90% of the antiques seized during an international operation targeting a cultural property trafficking network will be returned to Bulgaria, Deputy Minister of Culture Todor Chobanov told “Nova TV”. “This is an unprecedented operation in..
+359 2 9336 661