Thanks to the Recovery and Resilience Plan, 953 companies that meet the requirements will receive assistance under the "Technological Modernization" line. The funds will be available in March. This is what the Minister of Innovation and Growth, Alexander Pulev, told the BNR.
According to one of the procedures under the Plan, small and medium-sized enterprises will be able to receive a subsidy of up to 50% for their own RES installation plus accompanying infrastructure. The procedure is expected to start in February. The idea is for small and medium-sized businesses to achieve energy security for their own needs. The budget is about 100 million euros. The actual implementation of the projects will start after the middle of the year.
The overall consumer confidence index in October 2025 fell by 4 points compared to July, the National Statistical Institute has reported. In July, the indicator decreased by 4.7 points compared to April. In October, there was an..
By mid-December, all military units in the country will be equipped with drone control simulators, said Major General Deyan Deshkov, Commander of the Land Forces, at the Lyulyak training ground near Stara Zagora. He clarified that the drones have..
Swiss commodity trader Gunvor said it has withdrawn its proposal to buy Lukoil’s foreign assets, including the refinery in Burgas, after the U.S. Treasury called it Russia’s ‘puppet’, Reuters reported. Prime Minister: Bulgaria has a..
Birth rate in Bulgaria has decreased by 33% over the past three decades. In 1994, 79,442 live births were registered in the country, while in 2024 the..
The European Commission has decided to withhold EUR 215 million from the second payment under Bulgaria’s recovery and resilience plan, the EC told the..
With 111 votes for, 51 against and 43 abstained, the National Assembly approved the establishment of an ad-hoc committee to investigate the activities..
+359 2 9336 661