Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prosecutor General requires hearing in Parliament regarding high-level corruption

Ivan Geshev
Photo: BGNES

Bulgaria’s Prosecutor General Ivan Geshev has sent a letter to the President of the 49th National Assembly Rosen Zhelyazkov with a request to be heard by the MPs in connection with specific pre-trial proceedings related to high-level corruption and influence peddling, the prosecutor's office announced. The Prosecutor General has noted that the hearing should be held behind closed doors, because the pre-trial proceedings contain sensitive information.

Ivan Geshev was expected to make an address on the state television on Friday. The prosecutor general asked to exercise his constitutional right in view of the demands for his resignation. Today, however, it became clear that the address was postponed. Yesterday, the Plenary Session of the Supreme Judicial Council (SJC) interrupted its nearly 14-hour meeting at which it was discussing the request to remove Prosecutor General Ivan Geshev. The session will continue on Monday, 12 June. According to media reports, Geshev will make his address next week.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM