Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Accelerated schedule for the construction of third reactor at Bulgaria's Kozloduy NPP

Photo: kznpp.org

Westinghouse Electric has signed a contract with Kozloduy NPP - New Capacities a contract for preliminary engineering activities for the construction of a new reactor using the AP1000 technology at the site of the Bulgarian nuclear power plant. 

The contract foresees an assessment of the possibilities for integrating the Bulgarian industry in the project for the construction of a new nuclear capacity with American technology and for the maximum use of the existing infrastructure at the Kozloduy NPP site. 

Two reactors with Russian BBEP-1000 technology are currently operating at the site and there is a foundation for a third reactor.

The joint task force has already begun evaluating regulatory, licensing and design requirements and is developing an accelerated work schedule, Westinghouse Electric said in a statement.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

One more group of Bulgarian citizens return from Lebanon

The first group of Bulgarian citizens evacuated from Lebanon with the help of Canada came home last night, the Bulgarian Foreign Ministry has announced. This took place in close coordination between the Foreign Ministry’s Situation Centre, the..

published on 10/5/24 9:25 AM

Warning of hazardous precipitation across Bulgaria

On Saturday, the lowest temperatures will be between 14 and 19°C; in Sofia - about 16°C. In the western regions, the highest temperature will be 19-20°C, while in the eastern regions of the country the temperature will reach up to..

published on 10/4/24 6:55 PM

EU's court lifts requirement for trucks to return to operational centre every two months

The Court of Justice of the EU has overturned part of European legislation requiring trucks for international transport to return every two months to the carrier's base. With its decision, the institution confirmed all other..

published on 10/4/24 4:31 PM