The Ministry of Defence has terminated the public procurement procedure for the delivery of 6 overhauled engines for MiG-29 fighter aircraft, the Bulgarian news agency BTA reports, citing data from the public procurement register.
The reason is that not a single bid has been made in the call for tender announced in March with an estimated value of EUR 13.49 million, VAT included, the BTA reports. At the end of June, the Bulgarian TEREM-HOLDING EAD won the other public contract for the repair of six engines for the Bulgarian MiG-29s.
However, it is going to use as subcontractor the Lutsk Repair Plant “Motor”, Ukraine, whose share of the contract is 90%.
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common currency, the euro, both in the EU as a whole (74%) and in the euro area (81%). In Bulgaria,..
Despite the bad weather, dozens of children and their parents took part in an initiative for making toys for the Christmas decoration of the capital city. At the initiative of Sofia municipality, a workshop was put up in the square in front of..
The Democrats for a Strong Bulgaria (DSB) are to nominate the party’s leader Atanas Atanasov for president of the 51 st National Assembly. According to BNR sources, the decision was made by the party’s national leadership and will be put to..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
On the occasion of World AIDS Day, observed on December 1, volunteers from the Bulgarian Red Cross Youth in Sofia will light tealights on the Lovers'..
+359 2 9336 661