Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

The oil refinery in Burgas violated EU and US embargo on Russian oil, CSD say

Lukoil - Neftochim Burgas
Photo: BNR - Burgas

"Neftochim" violated the EU oil embargo and exported fuels produced from Russian oil to the EU and USA, Martin Vladimirov from the Center for the Study of Democracy (CSD ), has told BNT.

From March to July 2023, "Neftochim" exported fuels produced from Russian oil and the owner "Lukoil" accumulated 1 billion euros in profit for the Russian budget. The Center for the Study of Democracy points out two cargoes - 265,000 tons of diesel fuel delivered to the port of Rotterdam, and another cargo that reached Florida. According to the refinery, it did not have enough space to store the fuel. During the first 9 months of the year, the refinery in Burgas processed 4.5 million tons of Russian crude oil. The research was done jointly with Global Witness, "Politico" website reads.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Krasimir Koev

Bulgaria enjoys top quality grape harvest

'The quality of this year's grapes is perfect, but the quantity will be lower than last year,' said Krasimir Koev, director of the Executive Agency on Vine and Wine (EAVW), at the ninth Global Conference on Wine Tourism of the UN World Tourism..

published on 10/6/25 2:46 PM

Sofia hosts the 4th Forum of Prosecutors General of the Balkan Countries

Multilateral cooperation enables the achievement of common decisions on an equal footing among participants, said Prime Minister Rosen Zhelyazkov at the opening of the 4th Forum of Prosecutors General of the Balkan Countries, held in Sofia. He added..

published on 10/6/25 12:23 PM

A new 10-kilometer section of Hemus Motorway has been opened to traffic

A new 10-kilometer section of Hemus Motorway (A2) between the Boaza and Dermantsi interchanges has been opened to traffic. Another 3 km will be opened in November. Construction also continues on sections 2 and 3 of Hemus Motorway, which span a total..

published on 10/6/25 11:41 AM