The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
By mid-December, all military units in the country will be equipped with drone control simulators, said Major General Deyan Deshkov, Commander of the Land Forces, at the Lyulyak training ground near Stara Zagora. He clarified that the drones have..
Swiss commodity trader Gunvor said it has withdrawn its proposal to buy Lukoil’s foreign assets, including the refinery in Burgas, after the U.S. Treasury called it Russia’s ‘puppet’, Reuters reported. Prime Minister: Bulgaria has a..
Bulgaria’s Premier Rosen Zhelyazkov and Ukrainie’s President Volodymyr Zelenskyy discussed energy security in the region and opportunities to strengthen cooperation in this area. The two held a phone conversation on November 6. They also discussed..
Birth rate in Bulgaria has decreased by 33% over the past three decades. In 1994, 79,442 live births were registered in the country, while in 2024 the..
The police have neutralized an organized crime group that transported migrants from Burgas through Sofia to the Serbian border, Sofia..
The majority in parliament overcame the president's veto on the Investment Promotion Act. The bill was passed in second reading on..
+359 2 9336 661