Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Idea of building a dam and power station on the Danube is being resurrected

Photo: BTA

Natsionalna Elektricheska Kompania (NEK) together with Romanian company Hidroelectrica has been updating a project for a hydroelectric power plant on the Danube River, situated between Nikopol and Turnu Măgurele, Minister of Energy Rumen Radev has told journalists in the Belmeken power plant. The idea of a power plant on the Danube with the construction of a dam that would also serve as a bridge is more than half a century old, investor.bg recalls.

Hidroelectrica has two such plants together with Serbia, and the company’s experience can be applied here as well, according to NEK. The work is still at a very early stage and the supposed cost of the project is about 6 billion euros for both countries, Georgiev said.

In the past the project was frozen, as the lower level of the Romanian coast could mean flooding of large areas and small islands.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria and US to exchange tax information automatically

Bulgaria and the US have already signed an agreement on the automatic exchange of tax information.  The document was signed by Deputy Prime Minister and Finance Minister Lyudmila Petkova and US Ambassador to Bulgaria Kenneth Merten. "Administrative..

published on 5/31/24 4:02 PM

Business climate marks improvement of 0.6 points in May

In May, the economic situation in the country improved for a second month in a row. There was an improvement in retail trade, construction and services, but there was a decline marked in industry.  In construction, industry and services, no price..

published on 5/30/24 1:12 PM
Bulgarian National Bank building

Within the framework of the budget deficit the government takes on new 3-year debt

The Bulgarian National Bank held an auction for the sale of securities with 3-year maturity at a 3% interest rate. At the auction, the Ministry of Finance offered bonds worth EUR 150 million. Interest will be paid once in 6 months, with the loan..

published on 5/28/24 9:19 AM