The scheduled annual maintenance of Unit 5 of the Kozloduy Nuclear Power Plant has been completed, the plant announced. The unit was reconnected to the national electricity grid at 9:53 AM following an inspection and a positive assessment by the Bulgarian Nuclear Regulatory Agency.
BTA recalls that Unit 5 of the Kozloduy NPP was shut down for scheduled annual maintenance and refueling with nuclear fuel on May 5. As part of Kozloduy NPP's programme to diversify nuclear fuel supplies, 43 fuel assemblies manufactured by Westinghouse were loaded into the reactor. This marks the beginning of a four-year process of Unit 5's phased transition to RWFA nuclear fuel.
Six migrants died after the car transporting them overturned on the shore of Lake Vaya near Burgas. Before the accident, the traffickers’ car had been chased by border police between the towns of Kiten and Burgas. The driver of the car — a Romanian..
In the period November 7 to 9, Sofia Tech Park will host the tenth edition of CASSINI Hackathons & Mentoring, organized by the European Commission and the European Union Agency for the Space Programme (EUSPA). The hackathon will..
On Friday , the lowest temperatures will be between 5 and 10°C; in Sofia - it will be around 6°C. During the day it will be cloudy and with precipitation. In Northwestern Bulgaria the amounts will be significant. Almost no..
Birth rate in Bulgaria has decreased by 33% over the past three decades. In 1994, 79,442 live births were registered in the country, while in 2024 the..
The European Commission has decided to withhold EUR 215 million from the second payment under Bulgaria’s recovery and resilience plan, the EC told the..
The police have neutralized an organized crime group that transported migrants from Burgas through Sofia to the Serbian border, Sofia..
+359 2 9336 661