Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

Photo: Road Infrastructure Agency

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian media. The works will be carried out every day for 10-12 hours, during daylight hours. Vehicles will travel in both directions on the lane that is not currently being repaired.

The estimated duration of the repairs is approximately 4.5 months per lane. An adaptive traffic light system will manage the traffic.
The total length of the Bridge of Friendship is 2,223 m. On the Bulgarian side, the Danube Bridge spans 1,057 m. No major repairs have been carried out since it was opened 70 years ago. The technical project for the repair of the facility provides for a complete replacement of the asphalt layers, panels, waterproofing, new road safety systems, markings, etc.

The Romanian authorities have been informed of the forthcoming rehabilitation through a series of meetings and letters.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Cool atmospheric front will pass through the country

On Wednesday, the minimum temperatures in Bulgaria will be from 11 to 16°C, in Sofia - 14°C . A cold atmospheric front will pass through the country, with cloudiness being more often significant. From the northwest to the southeast, it will rain in..

published on 9/16/25 7:35 PM

Bulgarian infrastructure to be modernized with the help of concessions

In addition to using EU funds, accelerating the development of key infrastructure projects can be achieved through concession mechanisms. This is a tool that the European Commission encourages. This was what Deputy Prime Minister and Minister of..

published on 9/16/25 6:33 PM

Sixth unit of Kozloduy NPP will also operate with US fuel

The sixth unit of the Kozloduy NPP will also start operating with American nuclear fuel next year. The first six Westinghouse cartridges will be placed in the reactor to determine their effect on electricity production. This became clear at a..

published on 9/16/25 6:18 PM