The Romanian National Company for Road Infrastructure Administration (CNAIR) has announced a tender for a feasibility study for the construction of a new bridge over the Danube River between Giurgiu in Romania and Ruse in Bulgaria, reports "Economedia". The maximum period for completing the study is 23 months from the contract's effective date.
The maximum cost of the feasibility study is estimated at 71.9 million Romanian lei (EUR14.46 million), which will be funded by EU grants provided through the Connecting Europe Facility (CEF). The documentation for awarding the contract for the feasibility study has been published in the Electronic System for Public Procurement. This will be the third bridge over the Danube between Romania and Bulgaria, "Economedia" recalls.
In 2024, Bulgaria's exports of goods to third countries decreased by 5.1% compared to 2023, amounting to EUR 15.4 billion (30 114.9 million BGN), according to data from the National Statistical Institute (NSI). Bulgaria's main trading partners..
It is extremely concerning that the largest company in Bulgaria, Lukoil Neftohim, which is part of the country's critical infrastructure, is still in the hands of a country that has declared Bulgaria a hostile state. This opinion was shared by energy..
“The divergence between the monetary and the fiscal policy pursued by the government continues to be the main reason why Bulgaria does not meet all criteria yet for entering the Eurozone,” Lyubomir Karimansky, member of the Governing Council of the..
+359 2 9336 661