On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and leader of the Bulgarian Communist Party, Todor Zhivkov, turned the first sod for the country's northern transport axis. This was also the start of construction of the motorway ring in Bulgaria. The main designer of the route is engineer Dena Palankova, BTA recalls.
By 1985, the difficult section with numerous tunnels and bridges passing through the Vitinia Pass was completed. The highest viaduct in Bulgaria (120 meters) is situated in this section. The planned length of the highway route is 418 km, which makes "Hemus" the longest motorway in Bulgaria, but currently 191 km are completed and in use. A new 7 km-long section is soon to be put in use.
In the second quarter of 2025, Bulgaria recorded the second-highest GDP annual growth in the European Union with a rise of 3.4% compared to the same period last year, according to Eurostat data. Compared to the previous quarter of 2025, Bulgaria..
Bulgaria’s state budget for 2025 does not add up. “The genie is out of the bottle – the state has never spent at such a pace,” warn financial experts. With only a few months left in the year, and despite the strenuous efforts of institutions such as the..
Bulgaria’s state gas supplier Bulgartransgaz has been “decapitalised” by a contract with Turkish company Botaş, Energy Minister Zhecho Stankov warned on Thursday, saying the deal could also threaten gas supplies to local district heating companies...
+359 2 9336 661